Zhixuanke 1in wide by 15ft 30ft 50ft 100ft 200feet long Nylon Training Leash - For Large,Medium and Small Dogs - Long Lead - Great for Training, Play, Camping, or Backyard (100 FT black, Black)


Huge Savings Item! Save 17% on the Zhixuanke 1in wide by 15ft 30ft 50ft 100ft 200feet long Nylon Training Leash - For Large,Medium and Small Dogs - Long Lead - Great for Training, Play, Camping, or Backyard (100 FT black, Black) by Zhixuanke at Today Dogs. MPN: ZXK-20180120-001-12. Hurry! Limited time offer. Offer valid only while supplies last. Built StrongNylon leashes have a long lifespan, cotton leashes get frail and break faster than you would think. Free Range 1 inch is built with heavy duty materials that can withstand daily use over an extended period of time. It can be used with medium and large size dogs.Sizing15 Feet 30 Feet 50 Feet 100 Feet 200 Feet.NYLON TRAINING LEAD - This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist


4.5 out of 5 stars with 45 reviews
Condition: New
Availability: In Stock
$24.00
$19.99
You Save: 17%


Quantity:  

 



Product Description & Reviews

Built StrongNylon leashes have a long lifespan, cotton leashes get frail and break faster than you would think. Free Range 1 inch is built with heavy duty materials that can withstand daily use over an extended period of time. It can be used with medium and large size dogs.Sizing15 Feet 30 Feet 50 Feet 100 Feet 200 Feet.NYLON TRAINING LEAD - This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist

 


Have questions about this item, or would like to inquire about a custom or bulk order?


If you have any questions about this product, contact us by completing and submitting the form below. If you are looking for a specif part number, please include it with your message.

First Name:
Last Name:
Email Address:
Your Message:

Related Best Sellers


teck Leather Short Dog Heavy Duty Leash for Large Dogs Training and Walking (16" x 3/4"-Braid)
By teck
ean: 0703684829751,

Dogs My Love Braided Nylon Rope Tracking Dog Leash, Black/Blue 15-Feet/30-Feet 1/4" Diameter Training Lead Small (30ft - Diam 1/4" (6mm))
By Dogs My Love
mpn: Z-096-5, ean: 0718088285980,

Heavy Duty Bungee Dog Leash by Tuff Pupper | Comfortable Neoprene Handle | Zinc Alloy Hardware | Perfect Training Lead for Medium to Large Dogs
By Tuff Pupper
mpn: 43237-2, ean: 0651950391443,

Petroad ColorPet Martingale Slip Lead Collar Bear Fruit Dog Leash for Medium and Large Dogs, Medium, Black Blue
By Petroad
mpn: 11118053, ean: 0712265456026,



Privacy Policy / Terms of Service / Accessibility Statement
© 2020 - todaydogs.com. All Rights Reserved.